In tandem with the Company’s macro policies and objectives, and in order to improve its organizational processes, the company has either implemented or is currently executing a few projects that are listed below:

Quality Management System

  • Implementation of Productivity Cycle Management.
  • Complex Development Project:
    • Olefin Unit Development Project, by 40%
    • Linear Low Density Polyethylene Unit Expansion Project, by 25%
    • High Density Polyethylene Unit Development Project, by 25%
    • Polypropylene Unit Development Project, by 25%
    • Offside Service Units Development Project, by 25%
    • Construction of the new Butadiene and Poly Butadiene Rubber Units.
    • Construction of Ethoxylate Unit
  • Investment in new projects:
    • Lavan Petrochemical Co.
    • Ardebil Petrochemical Co.
    • Ethylene pipe manufacturing line in the West
    • Petroshimiran Co.
    • Cathodic Protection of Buried Pipes.
  • Implementation of TQM based on EFQM criteria.
Environmental Management System:
  • Establishment & operation of wastewater treatment system (oily, hygienic & chemical).
  • Increasing the capacity of oily wastewater treatment unit at wastewater treatment unit and biological treatment system.
  • Sorting, collection, recycling and disposal of household & office garbage.
  • Project for production of chlrostyle chloride (CAC) based on direct method of acetic acid chlorination.
  • Replacement of benzene solvent with toluene in polymerization processes PBR.
  • Purchase of control equipments for improved combustion of the Complex torches.
  • Execution of naphtha pipeline from Esfahan to Arak.
  • Replacement of CFC in cooling & air conditioning systems throughout the Complex.
  • General environmental training at all levels in the company, for both the personnel and the contractors.
  • Design, construction & installation project for new boiler to provide steam for improved combustion of the main torch in emergency situations.
  • Creation of 254 hectares of green space (235 hectares of woods and 19 hectares of flowers, plants & lawns) throughout the Complex.
  • Identification & classification of wastes & their proper disposal.
  • Destruction of infectious hospital wastes by signing contracts with hospitals having proper furnaces and facilities for this purpose.
  • Burning wastes hydrocarbon material in special furnace.
  • Landfill design for burying solid wastes.
  • Purchase of wastes burning furnace.
  • Construction of mud reservoir basin at various spots of wastewater treatment unit.
  • Putting into operation the mud absorption system in wastewater treatment unit.
  • Construction of complementary tank TK-25 for saving rain water.
  • SBR project in wastewater treatment unit for pre-filtering of wastes of ETX/EOEG/EA units.

 

Occupational Health & Safety Management System:

  • Improving safety conditions and method applied for loading of chemical products (product storing).
  • Implementation of Hazop studies at all units of the Complex.
  • Risk reduction in storing, transport and unloading of ammonia at AC/BC and ethanol amine units.
  • Implementation of comprehensive ergonomic and occupational hygiene plan.
  • Risk reduction during relief and rescuing operation in the case of personnel injured in closed spaces.
  • Risk reduction during relief and rescuing operation in the case of personnel injured at height.
  • Examining safety valves in the Complex and preparing an inspection timetable according to result of examination.
  • Risk reduction during LPG & C3, C4 unloading process.
  • Updating all technical documents and papers of the processing units.
  • Risk reduction during filling 1 & 3 butadiene capsules at BD/PBR unit.
  • Risk reduction at R-110 A/B/C Ethanol Amine unit.
  • Risk reduction when replacing chlor capsules at Et, Cooling unit.
  • Risk reduction at R-3008 A/B, R-2008 A/B in AC/BC unit.
  • Reduction of the risk related to AC/BC V-2004 A/B.
  • Reduction of the risk related to AC/BC V-1007, P-4008.
  • Reduction of the risk related to opening of E-704 blockage in V-709 direction.